date prod/sim funnel

This block is part of the funnels group and was last modified in core v10.4.28.

date prod/sim funnel v10.4.28

In pins 2
  • Production required
    date
  • Simulation required
    date
Out pins 1
  • date
    date
env
production
simulation

A typical wiring for date prod/sim funnel: the date out pin feeds cast to value.

Studio canvas example for the date prod/sim funnel block: typical wiring for date prod/sim funnel.

Version history

Introduced in v10.4.28.


Back to funnels Return to the main group to view all sub-groups Back to env. funnel Return to the group to view all blocks within this group